By Malestorm

Show description

Read Online or Download ABB Electrical Installtion Handbook PDF

Best technique books

Embedded Generation

Call for for on-site and substitute strength new release is turning out to be, fueled via executive and public strain to extend iteration from renewable assets and effort effective plant, and via the capability financial advantages caused by privatization and deregulation of the availability zone. This booklet is a pragmatic, course-derived consultant that covers all elements of embedded (or dispersed) iteration, from major mover features to community reliability modelling.

Electromagnetic Shielding (Wiley Series in Microwave and Optical Engineering)

The definitive reference on electromagnetic protective fabrics, configurations, techniques, and analysesThis reference offers a finished survey of strategies for the relief of the electromagnetic box degrees in prescribed parts. After an creation and an outline of accessible fabrics, it discusses figures of benefit for protecting configurations, the defensive effectiveness of stratified media, numerical equipment for safeguarding analyses, apertures in planar steel monitors, enclosures, and cable defensive.

Troilus and Cressida (Webster's Chinese-Traditional Thesaurus Edition)

This version is written in English. notwithstanding, there's a working Chinese-Traditional glossary on the backside of every web page for the tougher English phrases highlighted within the textual content. there are lots of variations of Troilus and Cressida. This version will be u

Extra info for ABB Electrical Installtion Handbook

Sample text

84 I2t OFF 10-1 10-1 ABB SACE - Protection and control devices 10-2 10-3 10-1 1 10 102 I [kA] Note: The dotted curve for functional corresponds to the maximum delay (t1) wich can be set at 6 x I1, in the case where 320A CTS are used for T4 and 630A for T5. For all the CT sizes the maximum delay t1 is equal to 18s, except for 320 A CT (T4) and 630 A (T5) where t1=12s. 8 x In, I3 max = 9,5 x In Only the electronic settings are available. 12 12 I2t ON 10 10 102 102 1 1 T4 T5 400 I2t OFF 10-1 10-1 T5 630 T7 S,H,L 10-2 10-2 T6 630 T7 V T6 800 T6 1000 10-3 10-3 10-1 1 10 1 x In 2 10 I [kA] 10-1 1 10 10 x In 102 I [kA] Note: For all the CT sizes the maximum delay t1 is equal to 18s, except for 320 A CT (T4) and 630 A (T5) where t1=12s.

00 In prevention at 8 In 1SDC210003F0004 10-2 10-3 10-1 1 10 102 x In Note: For PR223DS and PR223EF the electronic settings only are available. 84 I2t OFF 10-1 10-1 ABB SACE - Protection and control devices 10-2 10-3 10-1 1 10 102 I [kA] Note: The dotted curve for functional corresponds to the maximum delay (t1) wich can be set at 6 x I1, in the case where 320A CTS are used for T4 and 630A for T5. For all the CT sizes the maximum delay t1 is equal to 18s, except for 320 A CT (T4) and 630 A (T5) where t1=12s.

2 Trip curves 3 General characteristics Trip curve electronic releases PR 122/PR123 release – Other protection functions Trip curve electronic releases The following curves refer to the particular protection functions provided for PR122/PR123/PR332/PR333.

Download PDF sample

Rated 5.00 of 5 – based on 6 votes